March 24th, 2025
Improved
Claims

The claims specification description for the ProgramCost table field CostsRecoveredFromOtherSources Field was updated on March 24, 2025.
The description for this field was updated from “Program-level costs recovered from other sources” to the following:
This field captures program-level energy efficiency (EE) activity costs that are recovered from ratepayers outside of the EE Public Purpose Program (PPP) budget, such as those covered by the General Rate Case (GRC). These costs are included to ensure accurate cost-effectiveness calculations but should not be confused with Integrated Demand-Side Management (IDSM) fields.
Claims ProgramCost: https://cedars.cpuc.ca.gov/claims/specification/data-rules-program-cost/