August 20th, 2025

Improved

Fixed

Specification

CET

CET 25.1 Release


The CET has been updated in version 25.1 to address issues in the 2024 Gas Avoided Cost tables, Societal Cost Test (SCT) calculations, and to update RIM calculation code, FuelID validations, and the CET’s output fields. This version of the CET utilizes the same input file that was updated for version 25.0 in May, 2025.  Please read on for information about each update in this release.


2024 Gas Avoided Cost Tables

An error in earlier interpretation of the gas avoided cost tables in the E3 ACC resulted in the CET referencing the 20-year methane leakage values instead of 100-year methane leakage values.  This has been updated (see documentation on CEDARS, below) with CET version 25.1 now correctly referencing 100-year methane leakage values. While testing the table update, PAs noted that their gas measures showed lower gas benefits in the range of 1% lower.


Societal Cost Test (SCT)

First integrated into the CET

Release 25.0

Decision

D.24-07-01

For the version 25.1 release, the Societal cost test has been fully implemented and results of this test for both the base and high case scenarios are shown in the outputs table.


Ratepayer Impact Measure (RIM)

Last modified in the CET

Release 25.0

Decision

D.19-05-019

Version 25.1 updates the RIM calculation code with intermediary calculations to properly take into account fuel substitution and rate data necessary to calculate rate impacts for CET avoided cost versions 2024 and 2026, as well as updated logic to apply the correct year of rates to the RIM calculations.

  • New Intermediary Calculations (not output)

    • RIMBenElec – Calculates bill increases for the new electric fuel in fuel substitution; used to populate BillIncrElec.

    • RIMBenGas – Calculates bill increases for the new gas fuel in fuel substitution; used to populate BillIncrGas.

  • Formula Updates

    • RIMRatio – Added BillIncrElec and BillIncrGas to the numerator

    • RIMRatioNoAdmin – Added BillIncrElec and BillIncrGas to the numerator


FuelID

First integrated into the CET

Release 25.0

Commission Resolution

E-5350

Version 25.1 includes a validation for the new FuelID field that was added to the CET input file specification in 25.0.  This field is required in the input file as part of the data structure, but the field can be left empty for 2026-2027 budget filings and claims.

For measure packages without a FuelID where the field is left empty, namely pre-2026 measures, the CET will reference MeasImpactType to determine if a measure is fuel substitution. This only applies prospectively to 2026- 2027; this does not apply if PY2025 is selected.


Specification Documentation Resources Update

The CET specification Documentation Resources section was updated to include the following:

  • Added 2026 v25.1 Electric and Gas Rate Tables

  • Added 2026 v251 Updated Electric and Gas Avoided Cost Data

  • Added 2025 CET Database Version 25.1

  • Added 2025 CET Database Version 25.1 Documentation


CET Outputs file

The inputs files that is included in the CET outputs.zip now includes all input fields that were provided to run the CET.

Added fields:

  • RateScheduleElec

  • RateScheduleGas

  • MeasInflation

  • FuelID


New Output Fields

CET 25.1 introduces several new outputs that enhance transparency for societal and RIM-related calculations.

New CET Output Field

Definition

GasBen_SB

Net societal base-case gas benefits

GasBen_SH

Net societal high-case gas benefits

GasBenGross_SB

Gross societal base-case gas benefits

GasBenGross_SH

Gross societal high-case gas benefits

WaterEnergyBen_SB

Net societal base-case water-energy benefits

WaterEnergyBen_SH

Net societal high-case water-energy benefits

WaterEnergyBenGross_SB

Gross societal base-case water-energy benefits

WaterEnergyBenGross_SH

Gross societal high-case water-energy benefits

GasSupplyCost_SB

Net societal base-case gas supply costs

GasSupplyCost_SH

Net societal high-case gas supply costs

GasSupplyCostGross_SB

Gross societal base-case gas supply costs

GasSupplyCostGross_SH

Gross societal high-case gas supply costs

WaterEnergyCost_SB

Net societal base-case water-energy costs

WaterEnergyCost_SH

Net societal high-case water-energy costs

WaterEnergyCostGross_SB

Gross societal base-case water-energy costs

WaterEnergyCostGross_SH

Gross societal high-case water-energy costs

BillIncrElec

Fuel substitution bill increases for electric

BillIncrGas

Fuel substitution bill increases for gas

These changes ensure the CET aligns with current CPUC cost-effectiveness policy expectations, particularly in valuing societal impacts and tracking real ratepayer costs when fuel switching occurs.