Problem that this solves:
In the Energy Division’s review of quarterly claims, they often see dual baseline measures where the second baseline costs are missing.

What we’d like it to do:

  • Enforce that an AR claim must have a nonzero incremental cost if there are nonzero savings in the 2nd baseline.

  • If a dual baseline measure has a saving populated, then 2nd baseline costs must be populated.

Fields:
Measure.UnitkW2ndBaseline
Measure.UnitkWh2ndBaseline
Measure.UnitTherm2ndBaseline
Measure.UnitkWhIOUWater2ndBaseline
Measure.UnitMeaCost2ndBaseline

Validation:
If 2nd second baseline energy savings are populated, then 2nd baseline costs must be > 0

Select the module in CEDARS
Status: Completed6 comments

Log in to comment and vote

Comments6

  • Kevin Truong (TEC)

    •

    Nov 17

    Hello, I’d like to follow up on whether NMEC claims are excluded from this validation rule. For SoCalREN, we have a few NMEC claims we’re submitting that have 2nd baseline savings but no 2nd baseline costs, so CEDARS currently rejects them.

    • cedars team

      Team•

      Nov 23

      Hi @Kevin Truong (TEC), we discussed this in the last dev demo. The notes I have on the topic is below. Let me know if you need further support.

      New validation for dual baseline measures: are NMEC claims excluded? — A question from Kevin on a completed ticket. Some of his NMEC claims have second baseline savings but no second baseline costs, so they’re being rejected. Corina explained that the participant cost calculation uses the second baseline cost, so if there are second baseline savings, the cost is needed. NMEC was only treated as excluded because NMEC claims normally have zero second baseline savings. Jake added that NMEC claims shouldn’t have second baseline savings at all, because they use an existing conditions baseline only. Decision: the validation stays as is. Tim (who works with Kevin) will follow up with the implementer to fix the claims.

  • cedars team

    Team•

    Mar 18

    •

    Merged request

    •

    2 votes

    AR claim must have nonzero incremental cost if nonzero savings in the 2nd baseline

    NMEC projects are excluded. Are there additional exemptions?

  • Jake Richardson (PG&E)

    Team•

    Mar 18

    Validation should be (if 2nd second baseline energy savings are populated then 2nd baseline costs must be > 0). You cannot rely on MAT like AR to trigger this, as we can do to-code AR that has no second baseline savings or costs.

  • Amy Reardon

    •

    Mar 5

    In Energy Division’s review of quarterly claims, we often see dual baseline measures where the second baseline costs are missing. We would like a validation on all dual baseline measures that says “If [dual baseline measure] then 2nd baseline costs must be populated.” We can discuss edge cases with the PAs when we fine tune the requirements. Thanks!