New validation for Dual Baseline measures
Problem that this solves:
In the Energy Division’s review of quarterly claims, they often see dual baseline measures where the second baseline costs are missing.
What we’d like it to do:
Enforce that an AR claim must have a nonzero incremental cost if there are nonzero savings in the 2nd baseline.
If a dual baseline measure has a saving populated, then 2nd baseline costs must be populated.
Fields:Measure.UnitkW2ndBaselineMeasure.UnitkWh2ndBaselineMeasure.UnitTherm2ndBaselineMeasure.UnitkWhIOUWater2ndBaseline Measure.UnitMeaCost2ndBaseline
Validation:
If 2nd second baseline energy savings are populated, then 2nd baseline costs must be > 0
- Select the module in CEDARS
Log in to comment and vote
Comments4
cedars team
Mar 18
•Merged request
•2 votes
AR claim must have nonzero incremental cost if nonzero savings in the 2nd baseline
NMEC projects are excluded. Are there additional exemptions?
Jake Richardson (PG&E)
Mar 18
@cedars team this is the same as covered in this ticket:
https://cpuccedars.featurebase.app/p/new-validation-for-dual-baseline-measures
Jake Richardson (PG&E)
Mar 18
Validation should be (if 2nd second baseline energy savings are populated then 2nd baseline costs must be > 0). You cannot rely on MAT like AR to trigger this, as we can do to-code AR that has no second baseline savings or costs.
Amy Reardon
Mar 5
In Energy Division’s review of quarterly claims, we often see dual baseline measures where the second baseline costs are missing. We would like a validation on all dual baseline measures that says “If [dual baseline measure] then 2nd baseline costs must be populated.” We can discuss edge cases with the PAs when we fine tune the requirements. Thanks!