CEDARS Simplified the claim table structure to five required relational tables: Claim, ContactClaim, ProgramCost, Measure and Site. The Measure and ProgramCost table uses the same specifications as the CET and budget filings. Claim reporting fields are consolidated into a single Claim table.
ADD WATER ENERGY SAVING FIELDS
Measure.WaterUse
Measure.UnitkWhIOUWater2ndBaseline
Measure.UnitkWhIOUWater1stBaseline
Claim.WaterGallons
ADD DATE FIELDS
Added two date fields to support claim alignment to DEER/eTRM values (Not required for 2023; will be required, when applicable, starting in 2024)
Claim.PermitIssuanceDate
Claim.ComplianceCertDate
ADD SEM FIELDS
Claim.SEM_ProgramCycle
Claim.SEM_ReportingPeriod
Claim.SEM_ProgramYear
ADD FIELDS
Measure.CEInputID
Claim.Type
Claim.CalEPA_Flag
Claim.CMPA_ApplicationID
Claim.CMPA_MeasureCode
Claim.ResLI_Flag
Claim.ResMFMH-Flag
Claim.OMBCSA_Flag
Claim.NRLease_Flag
Claim.NRSize_Flag
Claim.Lang_Flag
REMOVE FIELDS
MeasQualifier
MeasCostID
StdCostID
LaborRate
LocCostAdj
EnergyImpactID
TotalTechIncentive
EUC_Flag
Prop39_Flag
WaterOnly_Flag
FinancingPrgID
ImplementationPA
CEDARS will allow DEER_MeasureID to be empty when evaluating date validation.
REMOVE WARNINGS FROM FIELDS
RUL_Yrs
UnitkW2ndBaseline
UnitMeaCost1stBaseline
WhyCostsZeroed
WhySavingsZeroed
UnitMeaCost2ndBaseline
ADD RULE
Validation was added that restricts Negative IMC on the 2nd baseline (when RUL > 0).
The CET validation had recently removed this item; this change would make the validations consistent.
At least one active deemed measure includes negative IMC for the 2nd baseline cost.
All DEER value lists use dates instead of years.
ADD VALUE LIST
ApplicationID (CMPA value lists for custom projects)
MeasureCode (CMPA value lists for custom projects)
WaterUse (Options: Outdoor, Indoor, required when WEN savings are not zero)
ClaimType (Options: Deemed or Custom)
REMOVE VALUE LIST
LaborRate
LocCostAdj