Improve eTRM Sync Resilience for Invalid Measure Package Data


CEDARS synchronizes draft Measure Package data from eTRM to support Load Shapes uploads. We have encountered Measure Packages containing data that does not meet the assumptions required for processing within CEDARS. Examples include unexpected data formats, and invalid baseline data used for load shape calculations.

Because CEDARS does not control the quality or completeness of data maintained in eTRM, additional handling is needed to ensure that a single problematic Measure Package does not prevent the synchronization of all other valid Measure Packages.

Problem

Currently, when invalid or unexpected data is encountered during synchronization, the entire sync process can fail. This creates several issues:

  • Valid Measure Packages may not be synchronized into CEDARS.

  • Users have limited visibility into which Measure Packages caused the failure.

  • Troubleshooting requires investigation by development teams rather than providing actionable information to users and measure developers.


Proposed Solution

Enhance the synchronization process to be more resilient when invalid Measure Package data is encountered. When a Measure Package cannot be processed:

  • The sync should continue processing all remaining Measure Packages.

  • The problematic Measure Package should be excluded from synchronization.

  • The user should be informed which Measure Packages were excluded.

  • A clear reason for the exclusion should be provided where possible.

  • The system should support a broad range of validation failures and unexpected data conditions, rather than only handling known examples.

Select the module in CEDARS
Impact Profiles/Load Shapes
Select user type
PA admin, PA ordinary

Please authenticate to join the conversation.

Upvoters
Status

In Progress

Board
πŸ’‘

Feature Request

Tags

2026

Date

2 months ago

Author

cedars team

Subscribe to post

Get notified by email when there are changes.