CEDARS synchronizes draft Measure Package data from eTRM to support Load Shapes uploads. We have encountered Measure Packages containing data that does not meet the assumptions required for processing within CEDARS. Examples include unexpected data formats, and invalid baseline data used for load shape calculations.
Because CEDARS does not control the quality or completeness of data maintained in eTRM, additional handling is needed to ensure that a single problematic Measure Package does not prevent the synchronization of all other valid Measure Packages.
Currently, when invalid or unexpected data is encountered during synchronization, the entire sync process can fail. This creates several issues:
Valid Measure Packages may not be synchronized into CEDARS.
Users have limited visibility into which Measure Packages caused the failure.
Troubleshooting requires investigation by development teams rather than providing actionable information to users and measure developers.
Enhance the synchronization process to be more resilient when invalid Measure Package data is encountered. When a Measure Package cannot be processed:
The sync should continue processing all remaining Measure Packages.
The problematic Measure Package should be excluded from synchronization.
The user should be informed which Measure Packages were excluded.
A clear reason for the exclusion should be provided where possible.
The system should support a broad range of validation failures and unexpected data conditions, rather than only handling known examples.
Please authenticate to join the conversation.
In Progress
Feature Request
2026
2 months ago

cedars team
Get notified by email when there are changes.
In Progress
Feature Request
2026
2 months ago

cedars team
Get notified by email when there are changes.