Reported by Safia:
Hi CEDARS Support Team,
We are encountering AvoidedCostCombo validation errors uploading the CET input for SWHC049-09 (Ducted Residential Heat Pump). Impact profiles were generated on July 12, 2026. We uploaded the CET input zip from eTRM into CEDARS and encountered these errors - here'a summary: What passed / failed:
AR and NR failed for all building types
Error seen across all failing rows: Values = (CZ, Electric Impact Profile ID, Sector, PA) are not allowed for AvoidedCostCombo.
Example: Values = ('1', 'DMoExrDXHPRE-dxHP_eq-pkgSEER-17.8-SEER2-8.1-HSPF2RE-dxHP_eq-pkgSEER-14.3-SEER2-7.5-HSPF2*RE-dxHP_eq-pkgSEER-12.5-SEER2-6.4-HSPF2', 'Res', 'PGE') are not allowed for AvoidedCostCombo.
The profile ID is built by eTRM as:

Could you confirm why the AR and NR combinations are rejected and what the correct format should be if this format doesn't look right?
Res building type - planned fix:
Res rows failed because no load shapes were uploaded for the Res aggregated building type. Per our load shape meeting, the agreed approach is to use the highest-weighted residential building type as a proxy. Based on DEER weights (wts_res_bldg.csv), SFm holds ~69% of total residential weight and will be used as the proxy for Res for this measure. We will upload Res load shapes but we think the existing format error will still persist for this one as well.
Update:
AR rows only are failing - across all building types (DMo, MFm, SFm). The failure is due to the 6-segment Electric Impact Profile ID format required for AR (which includes the pre-existing technology ID). CEDARS is rejecting that under the AvoidedCostCombo validation.
NR rows for DMo, MFm, and SFm are passing - no errors for these combinations.
Res load shapes have since been uploaded successfully, and impact profiles have been generated in CEDARS. Since the Res building type only applies to NR and NC application types (not AR), the issue is not seen in the Res rows.
So, the only remaining open issue is the AR rows failing AvoidedCostCombo validation. Please let us know if any additional detail would be helpful for the investigation.
Please authenticate to join the conversation.
In Progress
Bug Reports
2026
9 days ago

cedars team
Get notified by email when there are changes.
In Progress
Bug Reports
2026
9 days ago

cedars team
Get notified by email when there are changes.