As a PA and CPUC, I would like IDSM reporting requirements introduced once policy guidance is available, so that costs and benefits can be reported consistently.
Current IDSM requirements lack clear guidance on what should be reported, where it should be reported, and how benefits should be measured.
Introduce IDSM reporting fields with clear definitions.
Confirm whether fields belong in the ProgramCost table.
Confirm whether IDSM should run through the CET.
Include reporting of relevant benefits.
Provide examples and guidance for consistent reporting.
Keep in mind the duplication of IDSM costs reported in other fields
Include examples (Load shifting with existing equipment, Multi-DER coordination, Water heater control programs)
Please authenticate to join the conversation.
2027
Feedback
Claim Spec
19 days ago

cedars team
Get notified by email when there are changes.
2027
Feedback
Claim Spec
19 days ago

cedars team
Get notified by email when there are changes.