Skip to main content

Button to sync eTRM draft measure packages

Put a button on the add load shapes page where the user selects a measure package to do an on-demand sync to eTRM to pull in the current draft measure package data. Today eTRM staff are emailing the dev team and asking for manual ad-hoc syncs.

This is in addition to the scheduled sync that happens every night.

Select the module in CEDARS
1 comment

Log in to comment and vote

Comments1

  • cedars team

    Team•

    Jul 29

    •

    Merged request

    •

    3 votes

    Load Shapes – On-Demand eTRM Sync

    Currently, eTRM measure package data is synchronized to CEDARS through an overnight process. When a measure developer updates load shape-related variables in eTRM, they must wait until the next day before those changes are available in CEDARS.

    This delay can significantly slow Load Shape development, particularly when developers are iterating on measure package configurations and need to re-upload Load Shapes multiple times.

    The goal of this enhancement is to reduce the time between measure package updates in eTRM and their availability within CEDARS, improving measure development efficiency and reducing workflow interruptions.