Add Fuel Sub Infrastructure Cost Fields to Claim Specification

Background: CPUC introduced fuel sub‑infrastructure cost reporting requirements in PY2023 for Kiteworks submission. Although PAs have been submitting these costs to Kiteworks along with the PII Site and Contact data, these requirements have not been incorporated into the claim specification in CEDARS.

Ask: Add the fuel sub‑infrastructure cost reporting requirements outlined in the attached CPUC excel template to the claim specification. https://cedars.cpuc.ca.gov/claims/specification/

FS Infra Costs Data Collection - Interim Draft v4 (1).xlsx

17.5 KB Spreadsheet

Select the module in CEDARS
Claims

Please authenticate to join the conversation.

Upvoters
Status

2026 Fixed Development

Board
📨

Feedback

Tags

2026

ETA
Aug 03, 2026
Date

About 10 hours ago

Author

Roopa Reddy

Subscribe to post

Get notified by email when there are changes.