Background: CPUC introduced fuel sub‑infrastructure cost reporting requirements in PY2023 for Kiteworks submission. Although PAs have been submitting these costs to Kiteworks along with the PII Site and Contact data, these requirements have not been incorporated into the claim specification in CEDARS.
Ask: Add the fuel sub‑infrastructure cost reporting requirements outlined in the attached CPUC excel template to the claim specification. https://cedars.cpuc.ca.gov/claims/specification/
FS Infra Costs Data Collection - Interim Draft v4 (1).xlsx
17.5 KB• Spreadsheet
Please authenticate to join the conversation.
2026 Fixed Development
Feedback
2026
About 10 hours ago

Roopa Reddy
Get notified by email when there are changes.
2026 Fixed Development
Feedback
2026
About 10 hours ago

Roopa Reddy
Get notified by email when there are changes.